Eye Nuts—For Lifting

Eye Nuts—For Lifting

Short Description:

Create your own lifting eye by adding an eye nut to a stud or bolt.


  • FOB Price: US $4000 /piece
  • Min.Order Quantity: 1Piece/Pieces
  • Ability: 1200set/Year
  • HS code: 84295211
  • Product Detail

    FAQ

    Our Service 

    Production Workshop

    Product Tags

    Material Stainless steel,carbon steel/copper/bronze/brass
    Diameter  M3-M42 ,1/4:-1-1/2
    Grade Class4.8,Class 6.8, Class 8.8, Class 10.9, Class 12.9
    size  any size is availiable
    Processing way according to buyer’s samples or drawings
    Payment Terms L/C,D/A,D/P,T/T,Western Union,MoneyGram,Paypal
    Delivery Time 20 working days after confirmed the sample and received the deposit.
    packaging Carton package,polybag pack ,pallet package
    application chemical industry,petroleum industry, construction industry,etc.
    Purchasing Notice Please lets know the Size, quantity, Material or Grade, surface, If it is special and Non-standard products, please supply the Drawing or Photos or Samples to us

    Stainless-Steel-304-316-DIN582-Eye-Nut-Lifting-Nut.webp (1) Stainless-Steel-304-316-DIN582-Eye-Nut-Lifting-Nut.webp


  • Previous:
  • Next:

  • 1.What are your advantages compared with other suppliers and manufacturers?

    High quality: As a professional and reliable supplier, we are experienced in the Quality  Inspection and Control. Every product will be strictly inspected before it is delivered to our customers.

    Competitive price: We are so glad to provide the most favorable prices for our customers. And the prices are negotiable by which a win-win result could be achieved.

    2. Which payment terms are available us ?

    T/T terms or other. On T/T  term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.

    3. How long with the delivery?

    Normally it takes about  20 days.

    4. How about  service?

    24 hours online, and skype/QQ/wechat/whatsapp so on.

    5. What is the warranty of our quotation?

    1000 working hours or a year whichever comes first.

    Pre-Sales Service

    * Inquiry and consulting support.

    * Sample testing support.

    * View our Factory.

    After-Sales Service

    * Training how to instal the machine, training how to use the machine.

    * Engineers available to service machinery overseas.

     

    工厂图片

  • Related Products